Chouhan launches 'Khet Bachao Abhiyan' from Raisen, MP (See 'Corp Brief') PMLA - Special Courts under PMLA cannot take cognizance of prosecution complaint without first giving accused opportunity of hearing, as mandated under first proviso to Sec 223(1) of BNSS: SC (See 'Legal Desk') Gadkari reviews quality of NH Projects in West Bengal and AP (See 'Corp Brief') Digital India BHASHINI & DPIIT sign MoU for Multilingual Access Across India's Investment Ecosystem (See 'Corp Brief') NI Act - After adoption of electronic clearance system, cheque return memo or bank endorsement need not bear seal or signature to be acted upon under Sections 138 and 146: HC (See 'Legal Desk') National Workshop on R&D in Water to drive Bharat's Next Wave of Water Innovation (See 'Corp Brief') PM SVANidhi completes Six Years of Empowering Street Vendors (See 'Corp Brief') DCA reviews implementation of Legal Metrology Reforms in N-E and UTs (See 'Corp Brief') Raksha Mantri & UP Chief Minister inaugurate 'Nausena Shaurya Vatika' in Lucknow (See 'Corp Brief') IBC - Offences u/s 68 and 235A of Code can be prosecuted only before competent Special Court in manner prescribed u/s 236 of Code: NCLT (See 'Legal Desk') A Highway bringing New Possibilities to Heart of Central India: Boregaon to Shahpur (See 'Corp Brief') National Biodiversity Authority realises Rs. 21.26 Crore through Benefit Sharing Mechanism (See 'Corp Brief') Ayushman Bharat Digital Mission crosses Landmark Milestone of 90 Crore ABHA Accounts (See 'Corp Brief') SEBI - Assessee's request for inspection of documents cannot be allowed where these form part of SEBI's internal administrative process & are not necessary for replying to SCN: SAT (See 'Legal Desk') Moratorium under the IBC (See CORP EINSICHT)

India's RE capacity registers 14.2% Year-on-Year growth

Published: Dec 12, 2024

By TIOLCorplaws News Service

NEW DELHI, DEC 12, 2024: MINISTRY of New and Renewable Energy (MNRE) has reported significant progress in India's renewable energy sector from November 2023 to November 2024. This progress underscores India's commitment to achieving its clean energy targets in line with the ‘Panchamrit' goals set by Prime Minister Narendra Modi.

Record Capacity Additions

As of November 2024, the total non-fossil fuel installed capacity has reached 213.70 GW, marking an impressive 14.2% increase from last year's 187.05 GW. Meanwhile, the total non-fossil fuel capacity, which includes both installed and pipeline projects, surged to 472.90 GW, a substantial 28.5% increase from the previous year's 368.15 GW.

During FY 24-25 a total of 14.94 GW of new RE capacity was added till November 2024, nearly doubling the 7.54 GW added during the same period in FY 23-24. In November 2024 alone, 2.3 GW of new capacity was added— marking a dramatic fourfold increase from the 566.06 MW added in November 2023.

Solar and Wind Power Experience Significant Growth

India's renewable energy sector has seen widespread growth across all major categories. Solar power continues to lead, with installed capacity rising from 72.31 GW in 2023 to 94.17 GW in 2024, a robust growth of 30.2%. Including pipeline projects, total solar capacity surged by 52.7%, reaching 261.15 GW in 2024, compared to 171.10 GW in 2023. Wind power also made notable contributions, with installed capacity rising from 44.56 GW in 2023 to 47.96 GW in 2024, reflecting a growth of 7.6%. Total wind capacity, including pipeline projects, increased by 17.4%, from 63.41 GW in 2023 to 74.44 GW in 2024.

Steady Contributions from Bioenergy, Hydro, and Nuclear Sectors

Bioenergy and hydroelectric projects also made steady contributions to the renewable energy mix. Bioenergy capacity rose from 10.84 GW in 2023 to 11.34 GW in 2024, reflecting a growth of 4.6%. Small hydro projects saw a slight increase, from

4.99 GW in 2023 to 5.08 GW in 2024, with total capacity, including pipeline projects, reaching 5.54 GW. Large hydroelectric projects grew incrementally, with installed capacity rising from 46.88 GW in 2023 to 46.97 GW in 2024, and total capacity, including pipeline projects, increasing to 67.02 GW from 64.85 GW in the previous year.

In nuclear energy, installed nuclear capacity grew from 7.48 GW in 2023 to 8.18 GW in 2024, while the total capacity, including pipeline projects, remained steady at  22.48GW.

These impressive figures underscore the Government of India's continued efforts to scale up renewable energy capacity and reduce dependence on fossil fuels. MNRE under Union Minister of New and Renewable Energy Pralhad Joshi has been taking various key initiatives reflecting India's dedication to fulfilling its climate commitments while strengthening energy security.

TIOL CORP SEARCH

TIOL GROUP WEBSITES